60°F

New Paris Bridge Open

<span style="line-height: 115%; font-family: 'Verdana','sans-serif'; font-size: 11pt;">The<b> </b>Route 4018 (Rocklick Hollow Road) bridge over Rocklick Creek and the Route 4020(Hinton Road) bridge over Dunnings Creek in New Paris Borough, Napier Township, Bedford County will open Monday, May 10. </span>

New Paris � The Route 4018 (Rocklick Hollow Road) bridge over Rocklick Creek and the Route 4020(Hinton Road) bridge over Dunnings Creek in New Paris Borough, Napier Township, Bedford County will open Monday, May 10.

The Route 4018 (Rocklick Hollow Road) bridge was a complete superstructure replacement with minor roadway approach work and guiderail upgrades while the Route 4020 (Hinton Road) bridge work consisted of a deck replacement with minor roadway approach work and guiderail upgrades.

The 1.4 mile detour will be lifted on Friday, May 7 and final inspection of the bridges will take place on Monday May 10. C.H. & D. Enterprises, Inc. of New Stanton, PA was the contractor for this $683,722 project.

Page: [[$index + 1]]
comments powered by Disqus