81°F

Mill Run Bridge Project

<span style="line-height: 115%; font-family: 'Verdana','sans-serif'; font-size: 11pt;">Beginning Monday, May 10, Cottle?s Asphalt Maintenance, Inc. of Bedford County will start work on the Route 4003 (Mill Run Bridge) project in Altoona, Blair County. </span>

Altoona � Beginning Monday, May 10, Cottle�s Asphalt Maintenance, Inc. of Bedford County will start work on the Route 4003 (Mill Run Bridge) project in Altoona, Blair County.

The $1.2 million project will consist of the replacement of the structure over Mill Run located on Broad Avenue and 31st Street in Altoona. Also as a part of this project there will be traffic signal upgrades and resurfacing and repairs to the bridge approaches.

Motorists are advised to use caution while traveling through this work zone. Route 4024 (Broad Avenue) and Route 4003 (Logan Boulevard) will be reduced to an 11 foot single lane during construction. Because of the reduced lane width, a truck detour is in place. Trucks will be re-routed on a 1.2 mile detour from Route 4003 (Logan Boulevard) to Route 764 to 31st Street.

This project is expected to be completed by mid December, 2010.

Page: [[$index + 1]]
comments powered by Disqus